Browse Categories

Complex modeling of 1866 iron dome of the US Capitol

Nyfeler Associates, LLC completed a complex task for modeling the crowded structural and other components inside the 1866 iron dome of the US Capitol. We want to thank Grant Stickler of Duncan-Parnell, Inc. for his assistance with some of the software and equipment we used to generate a 5,000,000,000-node, 63GB drawing, later utilized by our client to design improvements that could be constructed and installed without conflict. Together, we look forward to meeting future challenges that our clients will depend upon us to solve...

From George Nyfeler, LS, LEED AP President, Nyfeler Associates, LLC

Posts

2025 2024 2023 2022 2021 2020 2019 2018 2017 2016