Complex modeling of 1866 iron dome of the US Capitol
quote from George Nyfeler, LS, LEED AP President, Nyfeler Associates, LLC
“Nyfeler Associates, LLC completed a complex task for modeling the crowded structural and other components just inside the 1866 iron dome of the US Capitol. We would like to thank Grant Stickler of Duncan-Parnell, Inc. for his assistance with some of the software and equipment we used to generate a 5,000,000,000 node, 63GB drawing, later utilized by our client to design improvements that could be constructed and installed without confllct. Together, we look forward to meeting future challenges that our clients will depend upon us to solve.”